新奥燃气控股集团Conn_DevMan_Scen_Overview_EN_US.pptVIP

新奥燃气控股集团Conn_DevMan_Scen_Overview_EN_US.ppt

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新奥燃气控股集团Conn_DevMan_Scen_Overview_EN_US.ppt

SAP AG 2005, Scenario Overview: Connection Device Management/ * SAP Best Practices for Water Utilities Scenario Overview: Connection Device Management Connection Device Management Connection Device Management covers processes that keep up to date the equipment, the work orders, and service orders. The main processes covered by this Best Practices Scenario are: Good Receipt of Meters Connection Service Work Periodic Device Replacement Installation Processes for Meters Hydrant inspections Large meter service Hydrant billing Process overview – Goods Receipt of Meters The objective of this process is to receive meters into inventory and make them ready for installation in the field First meters are received into the inventory. Meters are then moved to a truck, either serialized or unserialized. Process flow: Receive new Meters on pallets Perform goods Movement Into inventory Issue meters To trucks Track meters ready to move ‘into the ground’ Process overview – Connection Service Work The objective is create, plan and execute work that needs to be performed on meters or Hydrants. The service order or notification is created from the relevant object. The relevant orders is selected from a list of possible orders. If an appointment is required, then this is made. The order is scheduled and executed. Process flow: Request for Work received Select type Of problem If appointment needed, Then schedule Schedule Order Release order To the field Process overview – Periodic Device Replacement The objective is to select, schedule and update status for meters that are due for periodic replacement. All meters due for periodic replacement are selected (no sampling is used). End when meter is back in the meter shop, where the test of the meter is performed. Process flow: Create Replacement list Select subset Of meters To be worked Replace meters Meter returns To meter shop For testing Process overview – Installation Processes for Meters This scenario covers instal

文档评论(0)

docinppt + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档