8D Report 中英文对照模板.xls

  1. 1、本文档共2页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
8D Report 中英文对照模板.xls

Texte 8D Report Reference No.: Concession No.: Complaint Date: Product: 8D-Title: Warranty Decision: Customer: Customer Material No.: Complaint type/mode: Serial No.: Supplier No.: Supplier name: Issuer: Contact Person at Customer: Telephone: Business Address: Telefax: Email: Contact Person at Supplier: D1 Sponsor: D2 Customer Complaint: D3 introduced on: effective from: Agreement of the customer with process or product-changing immediate measures at: D4 Responsible: completed on: to: Pot. failure qty: intern: 0 km: Field: D5 D6 Customer agreement at: by: planned introduction on: removed at: D7 Update for QM-System (FMEA, Procedure-Instructions, PQP ...) due date: Could the failure concern other processes, products or sites? If no: Why dont you expect other processes, products or sites to be concerned? D8 Participant: accomplished at: Results: P/QMM: Name: Date: Signature: Manufacturer Descr: Msg. ID Msg. Language Msg. Description T01 EN error message T02 error by generating supplier 8D actionbox T03 error by generating a new 1 - Step T04 error by jumping to 1 - Step T05 error by loading supplier 8D XML-File 1 T06 error by generating XML-Extract T07 8D actionbox T08 Supplier 8D XML T09 8D - XML export ended successfully T10 information T11 XML - import ended successfully T12 DX - step 1 created successfully T13 Supplier 8D.xml T14 error by generating 8D activity bar Team: Externals: Intermediate report date: Final report date: Lead time 0 day 2 days 30 days 90 days 2 days 7 days 8D-Report/8D报告 投诉日期: 中间报告: 最终报告: Manufacturing plant: 制造工厂: 客户: 供应商编号: 电子邮件: 客户投诉内容: Failure Location: 生产日期: 生效日期: 客户同意有关过程改变或产品改变的临时措施的日期: Failure Cause / Causing Process: Root cause(s) (RC) and verification of effectiveness: why could the failure occur? Production period affected from: 受到影响的生产周期: Signatures/签名: Expected quantity of further failure at produced parts: Adoption of Poss. Corrective Action(s) for other Processes, Products, Sites: Root cause(s) (RC) and verification of

文档评论(0)

zhangchao11 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档